Location: On Hickory Ave over Smith Creek approximately 2 mi. east of Wellman, IA
Letting Date: July 20, 2010
Contract Amount: $460,865.61
Contractor: Peterson Contractors Inc. of Reinbeck, IA
Comments:
Detour Routes:
Location: On W38 between 170th & 180th St
Letting Date: June 20, 2010
Contract Amount: $161,727
Contractor: Iowa Bridge & Culvert, Washington, IA
Comments: Beginning on Monday, August 9th, 2010 W38 will be closed to thru-traffic between 170th & 180th Streets, approximately 4 miles south of Wellman for this project. Iowa Bridge & Culvert will remove the 25' x 22' concrete slab bridge and replace it with a twin 10' x 8' x 79' reinforced concrete box culvert. Construction should be completed in approximately 3 months.
Detour Routes: Traffic should detour onto County Highway G20 to State Highway 1 then back on County Highway G26.
Location: Over Crooked Creek east of Washington in Section 24-75-8
Letting Date: May 18, 2010
Contract Amount: $737,437
Contractor: Iowa Bridge & Culvert, Washington, IA
Comments: Iowa Bridge and Culvert will remove the existing deteriorating bridge and replace it with a wider bridge that will improve the existing low clearance under the rail road bridge. Construction should be completed in 6 months depending on weather delays.
Detour Routes: Traffic will be detoured on to county road W-38 and Highway 92 during construction.
Location: Vine Ave south of Hwy 22 to 160th Street (4.0 miles)
Completion Date: September 17, 2009
Final Cost : $1,474,229
Contractor: Concrete Foundations Inc., New Hampton, IA
Comments: This project was partially funded with funds from the "American Recovery and Reinvestment Act of 2009."
Location: On Vine Ave 5 miles north of Ainsworth
Completion Date: April 26, 2010
Final Cost: $227,630
Contractor: Winfield Contractors, Wapello, IA
Comments: This is a single box RCB Culvert Replacement
Location: 3 miles northeast of Keota on G26
Completion Date: April 16, 2010
Final Cost: $282,131
Contractor: Helmkamp Construction of Iowa, Inc., Ankeny, IA
Comments: This is a triple box culvert replacing a deteriorating bridge on G26.
Location: Vine Ave between 135th Street and 150th Street
Letting Date: March 31, 2009
Final Cost : $72,599
Contractor: McCulley Culvert, Barnes City, IA
Completion Date: May 12, 2009
Comments: Includes a 8' x 6' concrete culvert extension on Vine Ave.
Location: 275th and Fir Avenue
Completion Date: June 25, 2008
Project Cost: After several years of litigation, the IC&E Railroad and Washington County reached a settlement of $90,000 to build the at-grade crossing. The railroad placed the actual crossing at their expense.
Contractor: Washington County
Comments: This is an at-grade railroad crossing to replace the railroad bridge that was vandalized and burnt down.
Location: 2.0 mile west of Hwy 1/92 on 230th Street
Completion Date: November 14, 2008
Project Cost: $73,901.50 + County expenses for RR flat cars and day labor
Contractor: Iowa Bridge & Culvert
Comments: This bridge utilizes railroad flat cars similar to the bridge built near Richmond in 2007.
Location: On Underwood Ave approximately 0.75 miles south of Hwy 92
Completion Date: May 8, 2009
Project Cost: $426,587
Contractor: Schmidt Construction Company, Inc., Winfield, IA
Estimated Start Date: November 2008.
Comments: This is a 126' by 34' pretensioned prestressed concrete beam bridge over the south fork of Long Creek.
Location: Vine Ave north of Hwy 22 to Johnson County line
Completion Date: September 5, 2008
Project Cost: $726,235
Contractor: Manatts, Inc. of Brooklyn, IA
Location: First 4.5 miles south of G38 on Elm Ave, 275th St, and Dogwood Ave
Completion Date: May 1, 2009
Project Cost: $1,089,236
Contractor: Cole Construction Co, Inc., Keosauqua, IA
Comments: This is a 4.5 mile grading project with approximately 20 culverts to be completed. This is the second phase of reconstruction with eventual paving of the road to provide a paved crossing over the Skunk River between Brighton and Richland.